Construction skip bin, Templestowe: a large teal skip full of old weatherboards and plasterboard beside a house extension

Builders and renovation skipsConstruction skip bins across Melbourne’s eastern suburbs

Kitchens, bathrooms, extensions and fit-outs: plasterboard, tiles, timber, cabinets and packaging. Tell us what’s in the mix and we’ll match the skip to its weight.

  • Heavy and mixed loads priced up front
  • Road permits arranged
  • A tip docket on request

Get a skip quote

The skip
What size skip?

Delivery and placement

Where will the skip go?

Anything about access? (tick any)
Where should we send the price?

By sending this request you agree to us passing your details to the local skip hire business that delivers our bins, who may contact you about this booking. See our privacy policy.

What goes in a builders skip

Renovation and building waste, in a mixed builders skip. Companies name it differently: ASAP Bin Hire calls it commercial waste, “all general waste as well as concrete, soil, bricks, plaster board, and tiles”.

Goes in

  • Plasterboard, render and tiles
  • Timber framing, offcuts and floorboards
  • Old kitchen and laundry cabinets, vanities and doors
  • Carpet, packaging and cardboard

Never goes in

  • Asbestos: it must go to a site authorised by EPA Victoria, and Asbestos in Victoria says removal “is best performed by licensed asbestos removalists”. If you find sheeting you’re unsure of, stop and get it checked.
  • Paint, chemicals and liquids
  • Gas bottles

Weight decides the size

Renovation waste is heavier than it looks once tiles, render and plaster go in. Yarra Valley Skip Bins publishes heavy mixed-load limits of 1.3 tonnes for 4 m³, 1.5 for 6 m³ and 1.8 for 8 m³, and charges extra above them.

  • 3 or 4 m³A bathroom strip-out (heavy if it’s fully tiled)
  • 4 to 6 m³A kitchen renovation
  • 8 or 10 m³An extension or a full renovation, or several skips

Our rule of thumb. If most of it is concrete, brick or soil on its own, a single-material skip is cheaper: see soil and concrete skips.

Where it goes, and who’s responsible

EPA Victoria puts a duty on whoever hires the skip, not just the skip company.

  • “Most construction and demolition waste is industrial waste”, and it “must be taken to a place authorised to receive it”, including waste in a skip.
  • ”If you hire a skip bin or waste removal contractor, it’s your responsibility to know the contractor is taking your waste to a place authorised to accept it.”
  • After a May 2026 blitz on operators who dump waste, EPA said to make sure a contractor “can provide a docket showing it was taken to a lawful place”. We’ll give you the docket on request.

Permits on a building site

On the property, none. On the road, the skip company applies: Yarra Ranges has a building-site permit of $150.00 for up to 3 months, and its asset protection sign-off checks that “The nature strip has been cleared of skip bin(s), building materials and debris”. See council skip permits.

Builders skip prices

Published prices from two companies in the east, for mixed builders loads.

Published builders and heavy mixed skip prices

Skip and loadPublished priceWho publishes it
4 m³, commercial waste$550ASAP Bin Hire, Kilsyth (main table)
4 m³, heavy mixed load up to 1.3 t$725Yarra Valley Skip Bins, Dixons Creek
6 m³, commercial waste$780ASAP Bin Hire, Kilsyth (main table)
6 m³, heavy mixed load up to 1.5 t$885Yarra Valley Skip Bins, Dixons Creek
8 m³, commercial waste$950ASAP Bin Hire, Kilsyth (main table)
8 m³, heavy mixed load up to 1.8 t$1,245Yarra Valley Skip Bins, Dixons Creek

Each row is one company’s published price, not ours. ASAP Bin Hire’s commercial waste is “all general waste as well as concrete, soil, bricks, plaster board, and tiles”, with no glass; Yarra Valley Skip Bins’ heavy mixed loads carry the weight limit shown, with an extra charge beyond it. Neither states whether GST is included. Checked 1 October 2026.

Extras and every published price: skip bin prices.

Common questions

How long can I keep the skip?

We confirm the hire period with the price. Published standard hires in the east are mostly 3 or 4 days: Yarra Valley Skip Bins lists a standard 3-day hire, and M Tucker & Sons includes 3 days and charges $25.00 for each day beyond.

What if I overfill it?

Fill it level with the top edge. An overfilled skip can’t be transported: M Tucker & Sons, for one, charges a $110.00 return fee when that happens.

Where these figures come from

The prices and rules on this page come from these published pages, checked on 1 October 2026.

Renovating? Get a skip quote

Choose a size, tell us what’s going in it and where it’s going, and send the request in about a minute.